Post Info TOPIC: Shop upgrades


President

Status: Offline
Posts: 7253
Date:
Shop upgrades
Permalink  
 


Not sure if this is the proper place for non-automotive "projects", but here it is.

I bought the first set of lumber to add more ceiling joists for strength and to modify the first one in for an overhead door.

I neDSC06120.JPGDSC06122.JPGDSC06123.JPGDSC06124.JPGed to remove the fancy stuff on the wall to add the post.

 



Attachments
__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

Some Assembly Required

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS 350 rs



1K+ Club

Status: Offline
Posts: 1166
Date:
Permalink  
 

Have fun, looking forward to updates.

Karl

__________________

More ambition than brains,

If you have more than 5 of anything, best to stop counting!



President

Status: Offline
Posts: 7253
Date:
Permalink  
 

I had to peel the Mylar panels off a layer of Styrofoam insulation that was nailed to the girts to get down to them. The foam in between will stay.

I needed to notch the top of the beam for the joist but my circular saw only went 2.5" deep and the slot needs to be 4 3/8ths. The chain saw is plenty capable of chewing the wood out, but it took patience and care to get it decent.

The beam sits on the floor and is held to 3 of the girts with these brackets to prevent it from moving.

 

 

DSC06126.JPGDSC06127.JPGDSC06128.JPGDSC06130.JPG



Attachments
__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

Some Assembly Required

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS 350 rs



President

Status: Offline
Posts: 7253
Date:
Permalink  
 

I got the other post notched and attached to the girts. Then made a 26' long joist from 16' and 10' 2x8's. Got that lifted up on the forklift and fit it the notches. NEXT set, I'm making the notch a little wider than 1.5", as I had to "convince" one side to drop in. Got out the new nail gun. It's a little heavy and awkward to haul up the ladder, with the hose, but MAN is that nice to be able to pull the trigger to sink a 3" nail without balancing on the ladder and hammering it in...thumbsup

DSC06140.JPGDSC06141.JPGDSC06142.JPGDSC06143.JPG



Attachments
__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

Some Assembly Required

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS 350 rs



1K+ Club

Status: Offline
Posts: 1166
Date:
Permalink  
 

Figured you would use round dowels like the Amish and Mennonites.

The chain saw was a dead giveaway that was not the case.
Looks like this project gave you another excuse to buy another tool (nailer)

Karltiphat

 



__________________

More ambition than brains,

If you have more than 5 of anything, best to stop counting!



President

Status: Offline
Posts: 7253
Date:
Permalink  
 

more ambition than brains wrote:

Figured you would use round dowels like the Amish and Mennonites.

The chain saw was a dead giveaway that was not the case.
Looks like this project gave you another excuse to buy another tool (nailer)

Karltiphat

 


 I don't have the patience to whittle away on wood, or fit dowel pegs...rolleyes

My wrists, and shoulders are so worn from all the driving and mechanical work I've done my whole life, that hammering is fun for about 3 whacks and then stuff starts to hurt, so YES, valid excuse for another power tool. The nailer and 1,000 nails was only $88 at HB, so it's not a big dip out of the car parts fund...thumbsup The shop upgrade, alone, will see that tool used a fair amount and I want to build a, much bigger, storage shed to keep all the lawn and yard equipment in. We have an old 8x10 now that will get replaced with a 12x18 with 5x8 divided for a potting/garden room for the wife. Gotta include her to get it past the funding committee...laughing



__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

Some Assembly Required

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS 350 rs



President

Status: Offline
Posts: 7253
Date:
Permalink  
 

Got the next pair of posts up. The first was a piece of cake, other than cutting out a section of the wind brace, the second....not so much. I had to work around the entrance door. I put an 8' beam on each side and cut a cross beam and the upright from a 12 footer. Had to lift that sucker onto the saw horses...whew

The door now looks like the entrance to a Mayan temple...laughingDSC06146.JPGDSC06147.JPGDSC06148.JPGDSC06151.JPGDSC06150.JPG



Attachments
__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

Some Assembly Required

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS 350 rs



President

Status: Offline
Posts: 7253
Date:
Permalink  
 

After a 3 hour fight, the wife and I finally got the new, stepped, joist in the post notches. She drove the forklift, while I tried everything I could think of to get it to clear the perlins and drop in the notch. It was too close to the ceiling. I got it to go in one end, but not the end over the door. She finally asked how much work it would be to remove the short post and raise that side back up and re-attach. It didn't take a lot, but lifting the joist and post back onto the crossbeam stretched my right arm 2" longer than the left.

DSC06152.JPGDSC06153.JPGDSC06174.JPGDSC06175.JPG



Attachments
__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

Some Assembly Required

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS 350 rs



President

Status: Offline
Posts: 7253
Date:
Permalink  
 

Then I had to attach the 14' joist to the next truss, reinforce it and cut the center out. Got that done today. Good gawd, has it been HOT up in the ceiling the past few days !!!

DSC06178.JPGDSC06206.JPGDSC06224.JPGDSC06225.JPG



Attachments
__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

Some Assembly Required

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS 350 rs



1K+ Club

Status: Offline
Posts: 1728
Date:
Permalink  
 

I’m I understanding this that the notched joists are for clearing the garage door you are going to put in?



__________________

Chris P
East Central, Mn

66 Chevelle 300 deluxe



President

Status: Offline
Posts: 7253
Date:
Permalink  
 

Yes, to get a 12' tall overhead door, I needed 13' and the building is 12'. A 12' ceiling will only accept a 10' door, or a custom built 11' door, that costs about 3 times as much as a standard height door. I learned all that when I had the new shed built last year. That building is 13'.
I was online pricing a door to install myself and now learned the new joist I installed first, needs to be 3 ft further back from the stepped truss...banghead  Guess I'll be stepping that one back to the second truss for the tracks and opener...doh  It's all a learn as I go process.



__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

Some Assembly Required

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS 350 rs

Page 1 of 1  sorted by
 
Quick Reply

Please log in to post quick replies.

Chatbox
Please log in to join the chat!