Discussion Forum - Northstar Chevelle Club

Members Login
Username 
 
Password 
    Remember Me  
Post Info TOPIC: New pole building pad


President

Status: Offline
Posts: 7323
Date:
New pole building pad
Permalink  
 


Excavator came out and stripped the top soil so the ground can freeze next week. He is hoping to get his trucks in the backyard with sand for the pad. He also stripped off the grass to build a driveway off the parking area in front of the existing building. He has been delayed several weeks because of the non-stop friggen rain. He says the best we can hope for at this point, is for the ground to freeze hard enough to drive trucks on, as it's too late in the year to expect it to dry out...banghead









__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS/RS 350 M20



1K+ Club

Status: Offline
Posts: 1339
Date:
Permalink  
 

Looks like you are on your way!

__________________

Bruce L. - Lakeville MN

1971 Malibu Convert

 



President

Status: Offline
Posts: 7323
Date:
Permalink  
 

Wow, when I first posted the pics, they fit on my screen...now they are gigantic again. No clue what goes on with the sizing of pics by the host site.

__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS/RS 350 M20



Active Member

Status: Offline
Posts: 469
Date:
Permalink  
 

Good start. You will be finished in no time.

__________________

Larry L.

Coon Rapids



President

Status: Offline
Posts: 7323
Date:
Permalink  
 

Not up to me, Larry. Excavator needs to bring in a LOT of sand for the pad before the contractor can erect the building. It's all in mother natures hands.

__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS/RS 350 M20



President

Status: Offline
Posts: 7323
Date:
Permalink  
 

Excavator showed up at the crack of dawn Monday and got the partail drive in and most of the sand for the pad.





He was back at 8 am yesterday and finished it by 10. I parked my trailer and lawn tractor on it and sent this pic to the building contractor. Told him he better hurry with the building, cause I was already filling it up...laughing

He'll be here tomorrow and we'll stake it out for the drilling crew. Once the holes are drilled, we need to get the inspector out to approve them and then the building goes up...nana



__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS/RS 350 M20



1K+ Club

Status: Offline
Posts: 1339
Date:
Permalink  
 

Great to see that they got this done Mitch, looks like you will be able to beat "old man winter" on this!

__________________

Bruce L. - Lakeville MN

1971 Malibu Convert

 



3K+ Club

Status: Offline
Posts: 4731
Date:
Permalink  
 

Mitch, what did you use for the driveway?  Is that Class 5 rock?

I need to figure out what I want to do with the approach to my shop for next Spring.



__________________

Stan S.-Twin Cities 'South Metro'

1972 Malibu Convertible 2nd time around 

2001 Mustang GT Convertible 

Forum influenced terms: 'Link Paste', 'Stanitized', & 'Revolving garage door...' 

 



President

Status: Offline
Posts: 7323
Date:
Permalink  
 

SShink wrote:

Mitch, what did you use for the driveway?  Is that Class 5 rock?

I need to figure out what I want to do with the approach to my shop for next Spring.


 The rock right off the blacktop is 4-6" "break rock", is what they called it, about 8" deep.  The larger rock gives more footing on the soft ground. There is a layer of class 5 over that, to make the path smoother. The larger rock was needed to support the weight of the trucks and to try to prevent the blacktop from breaking off. it did crack some, but nothing like it would have without the 6" of rock as support. If you aren't planning on driving anything but cars back there, 3-4" of class 5 should hold the weight, but I would recommend having the sod scrapped off before the rock is laid down.

Wick rep was just here and we set the building corner markers. Material should be here next Wednesday and a building up by the end of that week...yep, kind of excited, right now...hyper



__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS/RS 350 M20



President

Status: Offline
Posts: 7323
Date:
Permalink  
 

The building came this morning and the 2 man crew set right to work getting the poles set today.



__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS/RS 350 M20



President

Status: Offline
Posts: 7323
Date:
Permalink  
 

Inspector came, looked, gave them the thumbs up and left.

3 hours later, the skeleton is taking  shape.



__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS/RS 350 M20



President

Status: Offline
Posts: 7323
Date:
Permalink  
 

Day 1, from dirt to girts. Tomorrow will be trusses and sheet metal.



__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS/RS 350 M20



Vice President

Status: Offline
Posts: 484
Date:
Permalink  
 

Look like you'll be turning on the heat and moving in by the weekend.laughing

Very Coolbeers



__________________

Bob W.

Lino Lakes



2K+ Club

Status: Offline
Posts: 2444
Date:
Permalink  
 

You should be excited, your taking big steps here. Looks like you may be just ahead of the weather. What are your plans for aa floor?

__________________

Kevin

Northwestern Ohio



President

Status: Offline
Posts: 7323
Date:
Permalink  
 

The crew was going to wait and start next Monday, but the forecast is for very cold weather, so they want it done this week.

Floor will just be gravel. This is a shell for storage, no windows, or utilities. The existing building will be the shop. It has a concrete floor and 240 volt, 100 amp service. It's going to take a fair amount of work and funding to get the sliding front doors replaced with an overhead and then finished and insulated for heat. HOPEFULLY, I can get all that done over the summer, but it depends on funding too. We don't have a mortgage on this place, but it ate a considerable chunk out of our savings to purchase and then go immediately into this project.

I'm told I better plan on working for Centerline until I have recovered the cost of this building...Imgonna



__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS/RS 350 M20



1K+ Club

Status: Offline
Posts: 1196
Date:
Permalink  
 

Familiar problem:
"Must work to pay for toys"

Work can be fun toocenuniv

Glad to see the progress on building!

Karl



__________________

More ambition than brains,

If you have more than 5 of anything, best to stop counting!



2K+ Club

Status: Offline
Posts: 2734
Date:
Permalink  
 

Looks like the snow cooperated and didn't drop as much as we had.  It will be a stress reliever to get the project done.

 

Hope to get a peek at you new camping ground soon.



__________________

Jim L

Lake City



President

Status: Offline
Posts: 7323
Date:
Permalink  
 

jim larson wrote:

Looks like the snow cooperated and didn't drop as much as we had.  It will be a stress reliever to get the project done.

 

Hope to get a peek at you new camping ground soon.


 We only got about 1", but it turned the roads into skating rinks. County Rd F was closed south of me, thru the Kinni river valley, and one of the crew had to backtrack to get around it.

Only 13 degrees this morning. They weren't here at the crack of dawn, like yesterday. Probably waiting for it to warm up a little.



__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS/RS 350 M20



President

Status: Offline
Posts: 7323
Date:
Permalink  
 

The 2 man crew thought they would be done today, but the cold mornings slowed them down a little and 1 of them had to leave at noon today, so the other has to come back tomorrow and install the end wall tins.

 

Entire ridge is clear urethane for light inside. There are no windows and no lights...yet.

 

 



__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS/RS 350 M20



2K+ Club

Status: Offline
Posts: 2444
Date:
Permalink  
 

Wow. that went up quick, you’ll have your storage next week.

__________________

Kevin

Northwestern Ohio



1K+ Club

Status: Offline
Posts: 1339
Date:
Permalink  
 

That is great news for you Mitch. Nice they could get it done so fast and beet the really cold weather.

__________________

Bruce L. - Lakeville MN

1971 Malibu Convert

 



President

Status: Offline
Posts: 7323
Date:
Permalink  
 

It needs 4" of gravel and compaction before I can put the 4 post lifts and cars in and the gravel isn't coming today. MAYBE late next week, after the cold Tuesday, Wednesday. Every day that goes by with the friggen early cold spell, puts the chance of getting it ready for lift and vehicle storage further out of range...rant2

Damn weather has sucked from the day we signed the purchase agreement on this place and I was in contact with builders.



__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS/RS 350 M20

AK


Active Member

Status: Offline
Posts: 179
Date:
Permalink  
 

Looks good Mitch!
I bet you're very excited get the structure up and move everything in

__________________

Andrew K

Minneapolis

1971 Chevelle M22 468



President

Status: Offline
Posts: 7323
Date:
Permalink  
 

He got-r-done today. Door is installed by a separate company and SHOULD be on later next week.

 

Standing against the back wall, it looks big....for now

 

 

Marking my territory...laughing

 



__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS/RS 350 M20



1K+ Club

Status: Offline
Posts: 1339
Date:
Permalink  
 

nice!

__________________

Bruce L. - Lakeville MN

1971 Malibu Convert

 



Active Member

Status: Offline
Posts: 469
Date:
Permalink  
 

I'm jealous! That is nice.

__________________

Larry L.

Coon Rapids



2K+ Club

Status: Offline
Posts: 2734
Date:
Permalink  
 

 Warm-up coming. Your going to make it.nana

 



__________________

Jim L

Lake City



Vice President

Status: Offline
Posts: 484
Date:
Permalink  
 

Never thought they could build it that quick...

Very Nice



__________________

Bob W.

Lino Lakes



President

Status: Offline
Posts: 7323
Date:
Permalink  
 

Bobs_Place wrote:

Never thought they could build it that quick...

Very Nice


 They go up quick and this was only 2 guys ! They would have had it done in 3 days, but one of them left at noon Friday and the other was here for 5 hours Saturday to finish it.



__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS/RS 350 M20



1K+ Club

Status: Offline
Posts: 1724
Date:
Permalink  
 

I have the clear ridge cap in mine, it really lets a lot of light in.



__________________

Chris P
East Central, Mn

66 Chevelle 300 deluxe



President

Status: Offline
Posts: 7323
Date:
Permalink  
 

Excavator brought in the gravel yesterday. I really like the limestone with the Ivory side walls.

I rented a plate compactor this morning to pack it down tight, but it was already quite stiff. The temp stayed above freezing overnight, but the ground was frozen under it, so I guess it froze the gravel too. 2 hours of hammering on it with the compactor made it very firm. No "after" pics of today. I already moved the travel trailer inside and will put the first lift in on Monday. The overhead door is scheduled to go in on Tuesday and the second lift might be in thither way, so I'll wait for the door to be done.

I retrieved my lift from John, after the excavator was done, so it's here, but I need to fab some reinforcement plates for the reservoir tank, I ripped off while loading it at the old place.

 



__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS/RS 350 M20



1K+ Club

Status: Offline
Posts: 1339
Date:
Permalink  
 

Looks like you will be in good shape, glad they got it in this fall.


__________________

Bruce L. - Lakeville MN

1971 Malibu Convert

 



2K+ Club

Status: Offline
Posts: 2444
Date:
Permalink  
 

Sure went up fast: nice to get that project behind you so quickly so you have storage close to home. Do you have electric power in the building? Or, what do you use to power your lifts?

__________________

Kevin

Northwestern Ohio



President

Status: Offline
Posts: 7323
Date:
Permalink  
 

No power this year, but will look at that next summer. I have 200 ft of high amp extension cord to power the lifts for now.



__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS/RS 350 M20



Founding Member

Status: Offline
Posts: 2787
Date:
Permalink  
 

Shed looks nice! What are the dimensions? I've been thinking about building one too.

__________________

Derek Kiefer - Mantorville, MN

69 Malibu Pro-Touring stroker LS1-383/T56 - 69 SS396-325/3spd project



President

Status: Offline
Posts: 7323
Date:
Permalink  
 

Derek, it's 30X48x13, 12X12 overhead door. Should have made it 56' deep for the lifts inline. I had planned to put the lifts on the left side, but there isn't enough length left to get the cars lined up. I can angle the lifts away from the wall, but the front lift protrudes into the door opening too much to get anything else past it. The only place that will work is straight in the door and then, it looks like, I STILL can't get past them for anything else. They will, most likely, need to be side by side on the back wall. Once the door is on and I can start messing with locations, I'll know for sure, but it isn't looking good for inline placement right now.

__________________

Mitch D.   River Falls, WI

Lifetime member of the "Cars apart Club"

1966 Chevelle SS 396 M20

1970 Chevelle SS 396 M20

1967 Camaro SS/RS 350 M20

Page 1 of 1  sorted by
 
Quick Reply

Please log in to post quick replies.

Chatbox
Please log in to join the chat!