theres lots of construction going on, though our area is cool, some groups may get displaced. The larpenteur gate area street is open but land around it is tore up On 3 of 4 corners that I saw.
-- Edited by bowtie on Monday 25th of June 2018 05:02:37 PM
SShink said
Jun 25, 2018
Thanks Bryan.
Just saw this on FB. At the Spring Dust Off show in May there was a lot of construction inside the fairgrounds. I think it was one of the ag buildings being completely redone.
I'll add this to the main SMN pasted post so that it doesn't get pushed down in the lower posts.
Lost in the 60s said
Jun 25, 2018
The first building you come to inside the Larpentuer gate was the dog display during the Fair. That building is being remodeled. Across the street from that, they are building another, new restroom and that side of the street has been eliminated from cars parking. There are other areas being worked on, but that is the only street I saw partially blocked at BTTF.
Registration for SMNats is now on the north side of the fairgrounds by the Larpenteur gate somewhere.
also, gate 15 will be open during the show for credentialed cars, but not for registration.
https://www.streetmachinenationals.net/credentialed-street-machine-summer-nats-participants-will-have-an-additional-entry-gate
theres lots of construction going on, though our area is cool, some groups may get displaced. The larpenteur gate area street is open but land around it is tore up On 3 of 4 corners that I saw.
-- Edited by bowtie on Monday 25th of June 2018 05:02:37 PM
Thanks Bryan.
Just saw this on FB. At the Spring Dust Off show in May there was a lot of construction inside the fairgrounds. I think it was one of the ag buildings being completely redone.
I'll add this to the main SMN pasted post so that it doesn't get pushed down in the lower posts.